Cleanaway – Henderson Tank Farm Piping Design

Location & Year
Henderson, Western Australia – 2022

Client
Cleanaway Henderson Waste Water Treatment Facility

Cleanaway required installation of four conical bottom tanks at the existing Henderson Tank Farm. BNV delivered piping detailed design of the drain and vent piping for these tanks as part of the overall integrated design in a congested brownfield environment. The detailed design scope included:

  • Finalisation of the vent piping spool design including activated carbon filter and pipe supports with the vent outlet extending out past the canopy roof in compliance to AS1940.
  • Finalisation of the drain spool design including pipe supports.
  • Piping related review and input into the overall construction specification.
More Projects